BWC
has completed the design of skid- mounted treatment
equipment and the design of the installation at the
user’s site for 20 megohm systems of up to 30 GPM
treatment capacities. Systems
included:
Reverse
Osmosis
Ultra
Filtration
Resin Bed
Deionization Primary
Treatment Equipment
Pre and Post
Treatment Support
Equipment:
Ultraviolet
Sterilizers
Chlorine/Iodine
Feed
Multi-media
Filters
Vacuum
Degasification
Cartridge
Prefilters/Final Filters
Heat
Exchangers
Acid/Base
Regeneration
Equipment
Pumps and
Storage Tanks. A
variety of piping materials have been utilized for the
distribution loop including PVC, CPVC, PVDF, HDPE and
PP piping systems. Microprocessor control of entire
systems has been the norm. |