PROJECTS / EDUCATIONAL AND RELIGIOUS FACILITIES /
Decatur Illinois Public Library
BWC provided mechanical, electrical, and plumbing engineering for the conversion of the former Sears Department Store into the new Decatur Public Library, as well as tenant lease spaces.


Fire protection design included relocation of sprinkler heads and repiping of sprinkler risers to serve both the library and eventual tenants.

Plumbing design included relocation of existing toilet facilities and construction of new facilities.

 

HVAC design included replacement of chiller and cooling tower.  Existing boilers are being reused.  Conversion to VAV zoned control with hot water reheat and installation of a building humidification system are also included.

Electrical design included changes to the distribution system within the building, replacement of existing light fixtures and addition of fixtures, and extensive communication cabling.


 

 




Millikin University
Frank M. Lindsay Field
Press Box
Decatur, Illinois

Our Lady of Lourdes
Catholic Church
Decatur, Illinois

Decatur Christian School
Decatur, Illinois




Central Christian Church
Decatur, Illinois
East Park Baptist Church
Decatur, Illinois
Lutheran School Association
Decatur, Illinois